NHL training camps are about five weeks away — and crews are working hard to get the Utah Mammoth’s new practice facility ready in time.
The Mammoth posted a video on social media Thursday afternoon to show the progress that has been made on the building, which is located at The Shops at South Town mall in Sandy.
The video appears to show that the concrete surfaces for the two ice sheets are in place, along with walls between them. Other apparent details include the placement of two of the tubs (there will be both hot and cold tubs, as well as an infinity pool) and the outline of the NHL locker room.
Inside one of the tubs, an inaugural season logo can be seen on one of the tiles. That’s one of many intricate details that are supposed to make this one of the best practice facilities in