To help stave off future storm surge situations, the Naples Airport’s operations team recently completed training on a new flood barrier system designed to protect the airport’s buildings, vital equipment and technology.Naples Airport Authority purchased 3,000 feet of industrial-grade flexible tubing. Filled with water, linked together and anchored into place the tubing creates an airtight barrier proven more effective than sandbags at holding back floodwaters.

See Full Page