MARANA, Ariz. (KVOA) - Roadwork in Marana is expected to cause traffic delays for some residents until the end of the month.

According to the Town of Marana, the intersection of North Rillito Village Trail and Calmat Drive will be repaved by Canyon Building and Design and Eagle Rock Excavating LLC.

The work started on Sept. 17 and will continue through Sept. 30. The roadwork takes place from 5 a.m. to 5 p.m.

Residents are advised to use caution in the area and stop for flaggers who are directing traffic.

The roadwork is part of the U-Haul of Dove Mountain build.

See Full Page