LOUISVILLE, Ky. (WAVE) - Some MSD practice work will impact traffic on Dixie Highway this week.

On Saturday, a section of Dixie Highway near Depot and Kosmosdale Lane will be reduced to one lane of traffic in each direction.

MSD will be conducting a floodwall closure practice in the area. The practice is expected to last up to 12 hours. Traffic will return back to normal when they are done.

These floodwalls played a significant role during historic flooding in April.

The Dixie Highway closure is one of the largest in Louisville’s flood protection system.

See Full Page