Prime Minister Modi will inaugurate the Phase 2B of Mumbai Metro Aqua Line 3, which will run from Acharya Atre Chowk to Cuffe Parade. This is a significant step that is being taken to improve Mumbai’s city transport. This phase, once complete, will also complete the Aqua Line project which will make daily travel easier for millions of people.
Metro Line Phase 2B Details: Route, passenger capacity, benefits – All you need to know
PM Modi will officially inaugurate the final phase of the Mumbai Metro Line-3, kicking-off its final 10.99-km section from Acharya Atre Chowk to Cuffe Parade. With this, the full corridor, built at a cost of Rs 37,270 crore and connecting Cuffe Parade to Aarey JVLR, will be fully operational.
The entire 33.5-km Colaba–Bandra–SEEPZ metro line is 33.5 km long