The TTC is adjusting and introducing new bus routes as they prepare for the opening of the Eglinton Crosstown LRT.
All the routes are associated with the new Line 5 that will travel from Mount Dennis to Kennedy Station.
A “revenue service demonstration” is currently underway across the 19-kilometre, 25-station LRT line. The demonstration is meant to show the system is operating as designed and can welcome passengers.
It’s still unknown when exactly the line will open to the public. Although the stations are still closed, buses will stop outside or in-station bus terminals to mimic the future service.
The changes are so customers are able to familiarize themselves with the adjusted routes and connections.
The following routes will be adjusted: • 13 Avenue Rd – Northbound service will