The Maha Mumbai Metro Operation Corporation Ltd (MMMOCL) has announced temporary changes in the morning schedule of Metro Lines 2A and 7. According to official notification, these adjustments are being made to carry out connectivity works between Metro Line 7 and the upcoming Metro Line 9 (Phase 1) where integration work, essential system integration, and safety testing will be done.

प्रवाशांसाठी महत्वाची सूचना

📅 १२ ते १८ ऑक्टोबर २०२५ | 📍 मेट्रो मार्गिका २अ आणि ७ च्या सकाळच्या वेळापत्रकात बदल

मेट्रो मार्गिका ७ आणि मेट्रो मार्गिका ९ (पहिला टप्पा) या दोन मार्गिकांना एकत्र जोडणीची कामं आणि अत्यावश्यक प्रणाली एकीकरण (system integration) तसंच सुरक्षा चाचण्या… pic.twitter.com/RvzHXUpyDr — Maha Mumbai Metro Operation Corporation Ltd (@MMMOCL_Official) October 11, 2025

According to Maha M

See Full Page