Road collapses near Sukhi Sewania ROB on Monday

Bhopal: In response to the sudden road collapse near the Sukhi Sewania Railway over Bridge (ROB) on the Bhopal East Bypass, the Madhya Pradesh Road Development Corporation (MPRDC) has formed a three-member technical committee to investigate the incident. The committee has been instructed to submit a detailed report within seven days. Meanwhile, repair work on the damaged section has commenced, with a target completion timeline of 10 days.

The road collapse occurred on October 13. Fortunately, no casualties were reported. Authorities acted swiftly to barricade the affected area and diverted traffic to an alternate lane, ensuring continued vehicle movement with minimal disruption.

Constructed under the BOT (Build-Operate-Transfer) model by

See Full Page