Amid continuous rainfall triggered by Cyclone ‘Montha’, municipal authorities conducted extensive inspections in the affected areas to address water logging and traffic disruptions.

On Wednesday, Commissioner RV Karnan (GHMC) and AV Ranganath (HYDRAA) in a joint inspection visited the stretch between Masab Tank and Lakdikapul, where they observed heavy water stagnation near Mehdi Function Hall, leading to severe traffic congestion.

The officials questioned engineers about the causes of the flooding and instructed them to resolve the issue immediately.

Officials informed the Commissioners that pipelines measuring two-feet in diameter had already been laid on both sides of the road, but these needed to be linked with the drainage systems coming from Mahaveer Hospital and Chintal Basti are

See Full Page