Bulletins | News | Filmy | Food | Tech | Travel | Business
₹ 171.14 lakh DPR prepared for restoration and slope stabilization works
SRINAGAR, OCTOBER 31: Government today informed the Legislative Assembly that District Level Committee, Doda has assessed the damage and prepared Detailed Project Reports (DPRs) for slope stabilization and restoration works estimated at ₹171.14 lakh.
Minister Sakeena Itoo was replying to the Calling Attention Motion moved by MLA Shakti Raj Parihar regarding the situation arising due to land sinking in Bari–Sadra Bag villages of Mundhar Lower A Panchayat in Tehsil Kastigarh, District Doda. However the motion was presented in the House by MLA Rajeev Jasrotia in his absence.
Minister informed that adequate measures have been taken to

Take One

Raw Story
CBS News