Mumbai: The Mumbai Metropolitan Region Development Authority (MMRDA) on November 9 shared an update on its proposed 70-kilometre Integrated Tunnel Road Network project and said that the Detailed Project Report (DPR) is currently being prepared. It added that for drafting the blueprint, they have also invited tenders to appoint consultants.

What is the project about?

According to the MMRDA, the proposed Integrated Tunnel Road Network project will construct a 70-kilometre system of underground routes connecting the Mumbai Coastal Road, BKC Bullet Train Terminal, and CSMT Terminal 2, with plans for future expansion to the Eastern and Western Expressways as well as the north-south urban areas.

Let us know! 👂

What type of content would you like to see from us this year? — HubSpot (@HubSpot

See Full Page