Nalasopara: Road repair works in the Vasai-Virar area have commenced at a rapid pace, with various inaugurations being held ahead of the upcoming elections. However, the haste is reportedly compromising the quality of the work, as substandard materials are being used.

MLA Performs Bhumipujan For Multiple Projects

On Sunday, MLA Rajan Naik inaugurated and performed the 'bhumipujan' (groundbreaking ceremony) for various road works in Virar and Nalasopara. Among these was the repair of a road in the Santosh Bhuvan area of Nalasopara East.

Road Deteriorates Within 12 Hours Of Repair

The work was carried out in a hurry on Sunday night but deteriorated within just 12 hours. The gravel used on the paver blocks came loose, as no asphalt was used to bind the material.

Due to the slope of the

See Full Page