Movement between Krishnagar and Nabadwip is set to face significant disruption for over six weeks as the Nadia district administration has announced phased traffic restrictions on the Sri Gouranga Setu over the Bhagirathi.

The decision follows an official communication from the Nadia Highway Division No. 1 of the PWD (roads), which will undertake replacement of metallic bearings and allied structural components of the bridge from 15 November to 31 December.

Advertisement

The bridge, located at the 12 km point on the Krishnagar–Nabadwip Dham Road (SH-8), is a vital corridor for commuters, traders, school transport and pilgrims. With the repair work involving delicate engineering processes requiring minimal vibration and controlled load on the deck, the authorities have opted for a stagge

See Full Page