The southbound lanes of the Pattullo Bridge will be closed heading into Surrey for three nights for construction work on the replacement project for the aging span.
All southbound lanes, including access for southbound pedestrians and cyclists, will be closed between 9 p.m. and 5 a.m. the following day on:
• Thursday, Nov. 27
• Friday, Nov. 28
• Sunday, Nov. 30
Northbound travel into New Westminster will not be affected.
“These closures are needed to secure a new overhead directional traffic sign along King George Boulevard,” said TransLink. “The large sign will be installed over the right lane of the replacement bridge, before the Scott Road exit ramp.”
During the work, heavy equipment including a drill rig will block traffic lanes near the south side of the existing bridge. For sa

The Province

People Travel
CBS News Video
New York Post
ABC 7 Chicago Sports
AlterNet