Middle Tennessee Scheduled Lane Closures Through August 20, 2025

DAVIDSON COUNTY I-24

The resurfacing on I-24 from Haywood Lane to the Rutherford County line.

• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for texture coat application.

• 8/15 at 8 p.m. through 8/17 at 5 a.m., There will be a triple lane closure on I-24 eastbound at Haywood Lane for bridge repair. Two lanes are expected to re-open Saturday morning once concrete is poured.

MONTGOMERY COUNTY I-24

The resurfacing on I-24 from east of SR 13 (US-79) to west of Trough Springs Road.

• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for rumble strips, thermoplastic, and pavement markings.

RUTHERFORD COUNTY I-24

The I-24 ramp improvements at US 231

See Full Page