Middle Tennessee Scheduled Lane Closures Through August 20, 2025
DAVIDSON COUNTY I-24
The resurfacing on I-24 from Haywood Lane to the Rutherford County line.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for texture coat application.
• 8/15 at 8 p.m. through 8/17 at 5 a.m., There will be a triple lane closure on I-24 eastbound at Haywood Lane for bridge repair. Two lanes are expected to re-open Saturday morning once concrete is poured.
MONTGOMERY COUNTY I-24
The resurfacing on I-24 from east of SR 13 (US-79) to west of Trough Springs Road.
• Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures in both directions for rumble strips, thermoplastic, and pavement markings.
RUTHERFORD COUNTY I-24
The I-24 ramp improvements at US 231