For those who think there could never be a worse disaster than HS2, or hope that governments can learn from their mistakes, I have disappointing news. Later this month, ministers will unveil a future platinum medallist in the Fiasco Olympics: a project which even their own infrastructure watchdog calls ‘unachievable’. A new, high-speed line between Liverpool and Manchester which will actually take longer than the existing rail service.

Called Northern Powerhouse Rail, this section alone will cost a claimed £17 billion (in reality, perhaps £30 billion). It will be a high-speed railway on which trains can never reach high speeds, because the stations are too close together. It will leave Manchester via a vastly expensive new eight-mile tunnel in the wrong direction – roughly south, only the

See Full Page