The city of Venice took the first step toward improving persistent flooding issues in the Golden Beach neighborhood on Oct. 28, when it purchased a drainage easement to an undeveloped quarter-acre lot on Flamingo Ditch.
Purchase of the lot, which will be used to improve the retention capacity of Flamingo Ditch, as well as a location for real-time water-level monitoring of the drainage outfall, was one of several recommendations made by Coastal Protection Engineering in a feasibility study on drainage improvements for Flamingo Ditch.

Sarasota Herald-Tribune

People Crime
Washington Blade
FOX 13 Tampa Bay Crime
10 Tampa Bay
FOX 35 Orlando
WCTV
Orlando Sentinel
The Shaw Local News Sports