SDOT has just announced the timeline for previously promised changes/additions on the Alki Point “Healthy Street” – Beach Drive and Alki Avenue’s stretches west of 63rd SW – and vicinity. These are basically what it announced early this year would be the “next steps.”
That SDOT graphic summarizes what’s ahead:
We’re excited to announce that we’ll soon begin making upgrades to the Alki Point Healthy Street at 63rd Ave SW and Beach Drive SW. These upgrades will enhance safety, accessibility, and make it easier for people to cross the street. They include:
-New accessible curb ramps, crosswalk, a flashing pedestrian / bike crossing sign at the intersection of 63rd Ave SW and Beach Dr SW.
-Two new accessible parking spaces and two new passenger loading zones near the intersection of

West Seattle Blog

FOX 13 Seattle Crime
KWTX News 10
TheYoungTurks Video
Newsweek Top
Raw Story
E Online
Dakota News Now Sports
The Texas Tribune Crime
America News
Essentiallysports Football