Issuing a slew of directions, a bench headed by Chief Justice of India (CJI) B R Gavai directed the chief wildlife warden to work in consultation with the apex court-appointed Central Empowered Committee to ensure demolition of all unauthorised structures within three months. "The CEC shall supervise the ecological restoration plan developed by Uttarakhand," the bench directed.

See Full Page