Mumbai, Dec 12: Mumbai’s Metro Line-12 (Orange Line Extension) has crossed a significant construction milestone with the launch of its 100th U-girder near Dombivli MIDC Metro Station on Shilphata Road, underscoring the rapid pace at which the Mumbai Metropolitan Region Development Authority (MMRDA) is pushing the project forward.

The 23.57-km fully elevated corridor, designed with 19 stations, is set to provide seamless, energy-efficient connectivity between Kalyan, Dombivli, Taloja and the upcoming Navi Mumbai International Airport, with officials indicating that this achievement signals the beginning of an accelerated construction phase promising quicker, cleaner and more reliable mobility across the Thane–Navi Mumbai belt.

Key Engineering Features and Interchanges Across the Corridor

See Full Page