On Monday, the Minister of Electric Energy, Jorge Márquez, inspected the operation of the Juan Manuel Valdez thermoelectric plant in Sucre state and the Luisa Cáceres de Arismendi and Juan Bautista Arismendi generating plants in Nueva Esparta state.
According to a Press release From the ministry, Márquez verified in Sucre the scope of the technical improvements at the aforementioned plant in the Gran Mariscal de Ayacucho Industrial Complex (Cigma), in Güiria. The infrastructure contributes to the stability of the National Electric System (SEN) and contributes to offshore gas development.
Within the framework of the guidelines given by the President of the Republic, Nicolás Maduro, and thanks to the expertise of the workers of Corpoelec , comprehensive maneuvers are currently being ca