A water main break on Collier Boulevard Wednesday occurred when a contractor bored through the 24-inch water main. Repair crews are on the scene. Repairs are expected to take 12 to 14 hours.
Water main break at Collier Boulevard, one lane closed, boil alert issued for 3,000 customers

136