PHOENIX — Salt River Project (SRP) announced that the Tempe Canal and the Western Canal will be closed for clean ups and repairs from Nov. 20 to Dec. 20.
The utility organization said in a release that this year they will be using an excavator called the Menzi Muck, which can climb in and out of the canal without the use of ramps and maneuver through six feet of water.
The organization does dry up cleanings on a rotating, 10 year schedule to different portions of the canals.
RELATED STORIES • 2 of Arizona's biggest water sources, CAP and SRP, to connect in massive $250M project
2 of Arizona's biggest water sources, CAP and SRP, to connect in massive $250M project • Why the basin states' fight over Colorado River water is a big deal for Arizona
Why the basin states' fight over Colo

KTAR News 92.3

KOLD Tucson
FOX 10 Phoenix Crime
Daily Kos
AlterNet
CNN
New York Post
PupVine
Essentiallysports Football
Essentiallysports Motorsports
The Daily Bonnet