We need to prevent AI data centers from accessing public electricity and water in Pennsylvania. To operate in Pennsylvania, AI data centers must be compelled to build their own power plants separate from the public grid, and compelled to provide their own water source separate from public water. Anything less is robbery from the public.
There may be state legislation to void local zoning codes if they interfere with AI.
AI corporations will outsource their electricity and water consumption to the taxpayers to reduce their own costs, which can lead to opportunity costs for the public, such as job losses, lower wages, unacceptable stress to the electric grid, and water shortages. It is imperative to prevent this from happening.
Fast-tracking AI is a big mistake. Millions of taxpayer dolla

PennLive Pa. Politics

KETV NewsWatch 7
AlterNet
Wheeling Intelligencer
CNN
People Shopping
The Cut
Crooks and Liars
KCRA News
The Daily Beast