CHEATHAM & ROBERTSON COUNTY I-24

The resurfacing on I-24 from the Robertson County line, crossing through Robertson County to the Davidson County line.

• Daily, 9 a.m. – 2 p.m., There will be traffic shifts for both EB and WB exit ramps at Exit 31 for hydro-blasting and contrast striping. The ramps will remain open at all times.

DAVIDSON COUNTY I-24

The resurfacing on I-24 from Haywood Lane to the Rutherford County line.

• Nightly, 8 p.m. – 5 a.m., There will be alternating lane and ramp closures in both directions for striping and punch list operations.

ITS maintenance.

• 12/4, 8 p.m. – 5 a.m., There will be a WB lane closure for ITS maintenance.

Barrier wall repair.

• 12/7 – 12/11, 8 p.m. – 5 a.m., There will be a single lane closure at Exit 50A for barrier wall repair.

NES pol