BENTONVILLE, Ark. (KNWA/KFTA) — Multiple road and lane closures are scheduled in Bentonville through the end of August.

From Monday, Aug. 11, through Friday, Aug. 29, lane closures will occur from 9 a.m. to 3 p.m. on the northwest, northeast, southwest and southeast corners of SE J Street at SE Walton Boulevard. The closures are for traffic signal installation.

During the same dates, SE 4th Street between SE G Street and SE J Street will be closed daily from 8 a.m. to 4 p.m. for asphalt milling and overlay related to a private development project.

In addition, E. Central Avenue between SE B Street and SE F Street will be reduced to a one-lane flagging work zone from midnight to 6 a.m. on Aug. 12, 16, 19, 22, 26 and 29 for a private development construction project.

A real time map of c

See Full Page