NORTHPORT, Wash. – Northport bridge will see a single lane reduction beginning today through October 3 for preventative structural repair, according to the Washington State Department of Transportation (WSDOT).
WSDOT crews will be replacing splice bolts on the upper steel truss to keep the bridge in solid shape.
Delays of up to 10 minutes are expected while traffic is directed with a portable vehicle signal, WSDOT said.
Commercial vehicles with wide loads will need to use alternative routes, as the open lane will only be 10 feet wide.
Northport bridge connects State Route 25 over the Columbia River in Stevens County.